Our Clean Air Tracking System (CATS) allows users to process new applications, renewals, amendments and all other air permit related actions. If you are already registered, Login to CATS.
New applicants must register for an account. To get started:
Expand AllCollapse All
Boilers and Water Heaters
Filing Instructions for Fossil Fuel Burning Boilers and Water Heaters
Boiler and Water Heater Filing Requirements
Download Filing Requirements for Boilers and Water Heaters
Boiler Registration
- Download Boiler Registration I: Procedures for Boiler Registration for boilers 350,000 BTU/hr. to less than 2.8 million BTU/hr
- Download Boiler Registration II: Procedures for Boiler Registration for boilers 2.8 million BTU/hr. to less than 4.2 million BTU/hr
Professional Engineer (PE) Certification Letters
If a new Boiler Registration II application is not submitted by a registered Professional Engineer, then the PE Certification Letter for CATS filing is required
Download the P.E. Certification Letter for CATS
Boiler Work Permits
- Download the Procedures for a Work Permit Application for boilers 4.2 million BTU/hr. and above
- Download the Procedures for filing a Work Permit Extension
Boiler Amendments and Affidavits
- Downlaod the Procedures for filing an Amendment
- Download the Procedures for filing an Affidavit
Certificate of Operation
Download Procedures for Filing a Boiler Inspection Request (Original and Renewal) to Obtain a Certificate of Operation
Boiler Forms and Documents
Boiler FAQs, Engineering Criteria, and EPA Factsheet
- Download the Boiler FAQs
- Download the Engineering Criteria for Fossil Fuel Burning Boilers and Water Heaters
- Download the EPA Factsheet for Industrial, Commercial, and Institutional Boilers
Boiler Equipment
View the Accepted Boiler Equipment List
As of August 1, 2017, DEP will no longer accept new equipment acceptance applications. Download the Equipment Approval Directive.
Boiler and Burner Compliance Certification Form
A Boiler and Burner Compliance Certification is submitted by the filling PE to certify equipment (bare boiler, burner, assemblies, custom installation and control) not accepted by DEP will comply with all applicable regulations.
Download the Boiler and Burner Compliance Certification Form
Stack Adequacy
Draft calculations are required for a new boiler, induced draft fan or chimney and in accordance with the procedures in 2009 ASHRAE Fundamentals Chapter 21 and 2012 ASHRAE Systems and Equipment Chapter 35.
- Download the Stack Adequacy Form
- Download the Stack Adequacy Form Instructions
Boiler Tune-Ups
Download Annual Boiler Tune-up Guidelines
All boilers that are equal to or greater than 2.8 million Btu/hr must have annual tune-ups and records of the tune-up using these forms must be retained for a minimum of 5 years.
- Download the Annual Tune up Recordkeeping Form
- Download the Annual Performance Test Worksheet
Letter of Authorization
Owners need to provide a Letter of Authorization when changing a Professional Engineer, Registered Architect or Installer.
Download the Letter of Authorization
Installer Statement
Installer must submit the Installer Statement when the installer is not named on the Work Permit Application form or the owner changed the Installer.
Download the Installer Statement
Fuel Equivalency Form
- Download #4 Fuel Oil and Natural Gas Combustion Equivalent to #2 Fuel Oil Form for New Applications
Industrial Processes and Generators
Filing Instructions for Industrial Processes and Generators
If you require require assistance in determining which application process you should follow, please download and submit an Industrial Process Questionnaire.
Mobile Food Vendor, Char Broiler, and General Registrations
For procedures for filing a registration for:
- Operation of equipment with Environmental Rating C that produces a flowrate of equal or greater than 100 scfm and less than 2000 scfm
- Mobile food trucks with auxiliary engines
- Char broilers that cook more than 875 pounds of meat per week.
Download the General Registration—Process Sources, Mobile Food Trucks and Char Boilers
Solid Fuel Registration is required in order for DEP to conduct a Smoke and Odor Inspection. Once an application is approved, DEP will reach out to schedule an inspection.
Download the General Registration—Char Boilers and Solid Fuel Burning Equipment
Gas Station Registration
For procedures for filing a Gas Station Registration, download the Gas Station Registration.
Generator or Combustion Source Registration
For Procedures for filing a generator, engine or other combustion source registration, download the Combustion Registration.
Engine/Generator Filing Threshold
For filing requirements for engines and generators, download Engines, Generators, Turbines Determination of NYC DEP Filing Requirements. Units below the listed thresholds do not need to be filed.
Opacity Certification Form Form for Professional Engineers
Download the Opacity Certification Form for Professional Engineers
Method 9 Opacity Certification
Method 9 Opacity Certification is required for all generators regardless of their EPA Tier. This form should be completed and attached with an Inspection Request for original and triennial renewals through CATS. First time filing of EPA Tier 4 or equivalent generators do not need an opacity certification. Generators permitted as a registration must conduct an opacity test but do not need to submit the results to DEP.
Download the Method 9 Opacity Certification Form
Industrial Work Permits
- Download the Procedures for filing a Work Permit Application
- Download the Procedures for filing a Work Permit Extension
Industrial Inspection Request
Learn procedures for filing an Inspection Request (Original and Renewal) to obtain a Certificate of Operation.
Download the Inspection Request Procedures
Industrial Amendments and Affidavits
- Download the Procedures for filing an Amendment
- Download the Procedures for filing an Affidavit